Which two things are appropriate for a scrum master to do if the scrum team doesnt have the tools

In what ways does the Scrum Master keep a Development Team working at its highest level of productivity?


Options are :

  • By removing impediments that hinder the Development Team and facilitating Development Team decisions.
  • By helping the Development Team with user acceptance tests and tracking defects.
  • By ensuring each member takes turns speaking at the Daily Scrum and ending the event on time.
  • By keeping the Scrum board and burn-down chart updated daily.

Answer :By removing impediments that hinder the Development Team and facilitating Development Team decisions.

Which of the following statements are true about the Scrum Master role?


Options are :

  • The Scrum Master assigns the tasks to Development Team members and ensures they are completed within the committed timebox.
  • The Scrum Master helps those outside the Scrum Team understand which interactions are helpful and teaches the Development Team to keep the Scrum meetings to within the timebox.
  • The Scrum Master is responsible for updating the Scrum board and ensuring team members avoid conflict.
  • At the Sprint Review, the Scrum Master demonstrates the completed Increment and answers any questions from the stakeholders.

Answer :The Scrum Master helps those outside the Scrum Team understand which interactions are helpful and teaches the Development Team to keep the Scrum meetings to within the timebox.

Scrum Master Certification Prep - Questions Set 8


Options are :

  • Allow the Development Team to self-manage and decide for itself what to do.
  • Setup the meeting and tell the Development Team that is how it will be done.
  • Ask the Development Team members to alternate who is responsible for meeting setup.
  • Inform management and ask them to solve it.

Answer :Allow the Development Team to self-manage and decide for itself what to do.

A Development Team member has notified the Scrum Master of a potential data security risk. What action should the Scrum Master take?


Options are :

  • Notify the test team.
  • Add a Product Backlog item to address the security issue.
  • Ask the Development Team member to share the issue with the team as soon as possible.
  • Wait until the Sprint Retrospective to add security to the definition of "Done".

Answer :Ask the Development Team member to share the issue with the team as soon as possible.

A Scrum Master is keeping a list of open impediments, but it is growing and he/she has been able to resolve only a small portion of the impediments. Which would be the LEAST helpful technique in this situation?


Options are :

  • Consulting with the Development Team
  • Prioritizing the list and working on them in order.
  • Arranging a triage meeting with all project managers.
  • Alerting management to the impediments and their impact.

Answer :Arranging a triage meeting with all project managers.

Practice Tests for Scrum Master Certification Assessments Set 14


Options are :

  • Ensure the Scrum Team members have compatible personalities, have the tech leads clarify the expectations and responsibilities of each role, and propose a performance rewards system.
  • Have the Scrum Team members introduce their background experience with each other, ask the Product Owner to discuss the product and answer questions, and ensure the team understands the need for a Definition of "Done."

Answer :Have the Scrum Team members introduce their background experience with each other, ask the Product Owner to discuss the product and answer questions, and ensure the team understands the need for a Definition of "Done."

What guideline should the Scrum Master provide if the Product Owner asks how estimations should be made in Scrum?


Options are :

  • Estimates must be made in Story Points.
  • Estimates must be in relatives units.
  • The Development Team is responsible for estimates.
  • Estimates are made by the Product Owner.
  • Estimates must follow the Fibonacci Sequence.

Answer :The Development Team is responsible for estimates.

The Development Team discovers that it doesn't have the tools and infrastructure to make each selected Product Backlog item done. What is the most appropriate action for the Scrum Master to take?


Options are :

  • Stop the Sprint and have the Development team work on the infrastructure before continuing.
  • Encourage the Product Owner to accept partially done Increments and complete the work in the Hardening Sprint.
  • Coach the Development Team to improve its skills, tools and infrastructure over time and establish a Definition of "Done" that is actually possible to achieve given the current circumstances.

Answer :Coach the Development Team to improve its skills, tools and infrastructure over time and establish a Definition of "Done" that is actually possible to achieve given the current circumstances.

Agile Scrum Training, Scrum Master Certification Prep, Tests Set 1


Options are :

  • Learn why the Development Team wants this, coach the team on why the Daily Scrum is important and work with them to improve the outcome of the Daily Scrum.
  • Support the self-organizing team's decision.
  • Have the Development Team members vote on which days the Daily Scrum should occur.

Answer :Learn why the Development Team wants this, coach the team on why the Daily Scrum is important and work with them to improve the outcome of the Daily Scrum.

What action can the Scrum Master take to ensure communication between the Development Team and Product Owner is effective?


Options are :

  • Ensure all communication goes through the Scrum Master first.
  • Teach the Product Owner to talk in terms of technology and technical requirements.
  • Observe the communications between them and facilitate discussions if needed or by request.
  • Translate the technologies used by the Development Team in order for the Product Owner to make decisions.

Answer :Observe the communications between them and facilitate discussions if needed or by request.

How should a Scrum Master coordinate the work when more than one Scrum Team is working on one product?


Options are :

  • Teach them that it's their responsibility to coordinate with the other teams to integrate and create a shippable product Increment at the end of every Sprint.
  • Identify and manage the dependencies between Scrum Teams.
  • Have the Product Owner work with the tech leads of each team to parse the Product Backlog and minimize overlap in User Stories.
  • Merge the teams and work from a single Sprint Backlog.

Answer :Teach them that it's their responsibility to coordinate with the other teams to integrate and create a shippable product Increment at the end of every Sprint.

Scrum Master Certification Prep - Questions Set 5


Options are :

  • Monitor the progress of the Development Team and assigning tasks.
  • Remove impediments and facilitating inspection and adaptation opportunities as requested or needed.
  • Avoiding conflicts and escalating to the line managers if conflicts occur.

Answer :Remove impediments and facilitating inspection and adaptation opportunities as requested or needed.

The Scrum Master is responsible for the Scrum process being adopted and used properly.


Options are :

Answer :TRUE

As a Scrum Master, you observe that the Product Owner is not collaborating with the Development Team effectively. What actions would you take?


Options are :

  • Send the Product Owner to training.
  • Nominate a proxy Product Owner.
  • Act as the go-between.
  • Coach the Product Owner.

Answer :Coach the Product Owner.

Practice Tests for Scrum Master Certification Assessments Set 6


Options are :

Answer :TRUE

What is the most appropriate action for the Scrum Master to take if the Product Owner is having difficulties managing the Product Backlog?


Options are :

  • Have the Development Team order the work instead of the Product Owner.
  • Have the Product Owner order the items based on size, having the Development Team work on the smallest items first.
  • Offer the Product Owner help in understanding that the goal of ordering the Product Backlog is to maximize the flow of value.
  • Delegate the work to the Assistant Product Owner.
  • Delay the Sprint in order for the Product Owner to have enough time to prioritize the Product Backlog.

Answer :Offer the Product Owner help in understanding that the goal of ordering the Product Backlog is to maximize the flow of value.

What action should a Scrum Master take if the Development Team has decided that Retrospectives are no longer necessary?


Options are :

  • Start facilitating more productive and useful Retrospectives.
  • Suggest reducing the frequency of the Retrospectives.
  • Extend the Sprint time-box in order to fit the Retrospectives.
  • Comply with the team's decision.

Answer :Start facilitating more productive and useful Retrospectives.

Scrum Master Certification Prep - Questions Set 4


Options are :

  • There should be five Product Owners, one for each Scrum Team.
  • The product has one Product Backlog and one Product Owner.
  • There should be five Product Backlogs and one Product Owner to manage them.
  • There should be five Product Backlogs and five Product Owners.

Answer :The product has one Product Backlog and one Product Owner.

Several Sprints into a project, a client is complaining to the Product Owner about the poor performance of the product. As a Scrum Master, how can you help the Product Owner?


Options are :

  • Coach the Product Owner on effective ways to communicate this concern to the Development Team and encourage the Product Owner to add the performance issue to the Product Backlog.
  • Tell the Product Owner performance is defined by the Development Team.
  • Note the issue for the next Sprint Retrospective.
  • Notify the team responsible for system performance.

Answer :Coach the Product Owner on effective ways to communicate this concern to the Development Team and encourage the Product Owner to add the performance issue to the Product Backlog.

The Product Owner's primary concern is the flow of value reflected in the ordering of the Product Backlog.


Options are :

Answer :TRUE

Practice Tests for Scrum Master Certification Assessments Set 2


Options are :

  • Postpone the Sprint in order for the Product Owner to refine the Product Backlog to the level needed.
  • Extend the Sprint Planning time-box until the Development Team can forecast enough items to begin the Sprint.
  • Forecast the most likely Product Backlog items to meet the goal and discuss in the upcoming Sprint Retrospective why this happened and what changes will make it less likely to recur.
  • Request assistance from the technical architect.

Answer :Forecast the most likely Product Backlog items to meet the goal and discuss in the upcoming Sprint Retrospective why this happened and what changes will make it less likely to recur.

How should a Scrum Master divide a group of 100 people into multiple Development Teams?


Options are :

  • Create teams based on their functional layer.
  • Have the resource manager assign the people to teams.
  • Ask the developers to divide themselves into teams.

Answer :Ask the developers to divide themselves into teams.

You are the Scrum Master for four Scrum Teams working on one product. Several of the developers notify you that their teams will need full-time help of an external technical specialist in the upcoming two Sprints.  What key concerns should the Scrum Master take into account?


Options are :

  • Having enough work for all Development Team members.
  • The benefit of Development Teams solving the problem themselves and the ability to produce integrated Increments.
  • Maintaining a consistent velocity.
  • Hiring additional resources to fill the void in skillset.

Answer :The benefit of Development Teams solving the problem themselves and the ability to produce integrated Increments.

Agile Scrum Training, Scrum Master Certification Prep, Tests Set 5


Options are :

  • Making sure each member has an opportunity to answer all 3 questions.
  • Leading the Daily Scrum.
  • Teaching the Development Team to keep the Daily Scrum time-boxed to 15 minutes or less.
  • Updating the Scrum board.
  • All of the above.

Answer :Teaching the Development Team to keep the Daily Scrum time-boxed to 15 minutes or less.

Which role would know the most about the progress toward a business objective or a release, and be able to explain clearly the alternatives?


Options are :

  • The Product Owner
  • The Release Manager
  • The Development Team
  • The Scrum Master

Answer :The Product Owner

Which of the following are true about the Product Owner role?


Options are :

  • Can be shared between multiple people on a Scrum Team. Is the same as a Project Manager. Is played by a committee or a team of people.
  • Is one person. Can be influenced by a committee. Is accountable for ordering the Product Backlog.

Answer :Is one person. Can be influenced by a committee. Is accountable for ordering the Product Backlog.

Success Tips: Training for Scrum Master Certifications Set 3


Options are :

Answer :FALSE

Which role is responsible for engaging with stakeholders?


Options are :

  • The team lead
  • The business analyst
  • The project manager
  • The Development Team
  • The Product Owner

Answer :The Product Owner

Which statement best describes the responsibility of the Product Owner?


Options are :

  • Optimizing the value of the work the Development Team does.
  • Managing the Development Team.
  • Ensuring that the work meets the commitments to the stakeholders.
  • Acting as the go-between for the stakeholders.

Answer :Optimizing the value of the work the Development Team does.

Success Tips: Training for Scrum Master Certifications Set 1


Options are :

  • Writing User Stories
  • Ordering the Product Backlog
  • Representing stakeholders to the Scrum team
  • Attending the Sprint Review

Answer :Ordering the Product Backlog

Which statement is correct when the developers are working in the middle of the Sprint?


Options are :

  • The Sprint Backlog would be frozen
  • No user acceptance tests will be conducted until the end of the Sprint
  • The scope may be clarified as more is learned

Answer :The scope may be clarified as more is learned

Scrum Master Certification Prep - Questions Set 11


Options are :

Answer :FALSE

Who updates work remaining during the Sprint?


Options are :

  • The Development Team
  • The Scrum Team
  • The Scrum Master
  • The Product Owner

Answer :The Development Team

Conflict should be avoided at all cost on Agile teams.


Options are :

Answer :FALSE

Practice Tests for Scrum Master Certification Assessments Set 5


Options are :

  • Sprint Retrospective
  • Sprint Planning
  • Sprint Review
  • Daily Scrum

Answer :Sprint Retrospective

When multiple Scrum teams are working on the same product, should all of their outputs be integrated every Sprint?


Options are :

  • Yes
  • No
  • Yes, only if there are dependencies among them

Answer :Yes

Which of the following best describes transparency?


Options are :

  • The whole process should be visible to everyone.
  • The process should be visible, and understood by key stakeholders.
  • The whole process should be visible to stakeholders.
  • Significant aspects of the process must be visible to those responsible for the outcome.

Answer :Significant aspects of the process must be visible to those responsible for the outcome.

Practice Tests for Scrum Master Certification Assessments Set 5


Options are :

Answer :FALSE

The purpose of the Daily Scrum is for the developers to inform the Product Owner of the progress.


Options are :

Answer :FALSE

The Product Owner doesn't spend enough time on the project. Which of the following options is the best response from the Scrum Master?


Options are :

  • Nominate a proxy Product Owner
  • Train the Product Owner why it's important for her/him to spend enough time on the project
  • Bring up the issue in the Sprint Retrospective
  • Send the Product Owner to a proper training
  • Inform the Product Owner's functional manager

Answer :Train the Product Owner why it's important for her/him to spend enough time on the project

Success Tips: Training for Scrum Master Certifications Set 3


Options are :

Answer :FALSE

It's allowed to have team leaders when there are many developers working on a complex project.


Options are :

Answer :FALSE

Which statement is correct when multiple Scrum teams are working on the same product?


Options are :

  • There can be multiple Product Backlogs, when it's possible to divide the product into different application areas
  • There's only one Product Backlog for all of them
  • There can be multiple Product Backlogs, but still a single integrated Product Backlog to summarize them all.

Answer :There's only one Product Backlog for all of them

Scrum Master Certification Prep - Questions Set 9


Options are :

  • Partially complete the work
  • Move the work to a future Sprint
  • Ask a specialist to solve the problem within the remaining duration of the Sprint
  • Collaborate with the Product Owner to solve the problem

Answer :Collaborate with the Product Owner to solve the problem

Who creates the Sprint Goal?


Options are :

  • The Scrum Master
  • The Product Owner
  • The Scrum Team
  • The Development Team

Answer :The Scrum Team

How can we ensure that the performance requirements are addressed in the solution? (Choose 2 answers)


Options are :

  • Add them to the definition of "Done"
  • Add them as items to the Product Backlog
  • Add a performance tester to the team
  • Use hardening Sprints to improve performance

Answer :Add them to the definition of "Done" Add them as items to the Product Backlog

Practice Tests for Scrum Master Certification Assessments Set 5


Options are :

Answer :FALSE

How complete should the Sprint Backlog be at the end of the Sprint Planning meeting?


Options are :

  • Complete enough to show the work for the next few days.
  • It depends on the preference of the Product Owner.
  • The Sprint Backlog should be complete at the end of the Sprint Planning.

Answer :Complete enough to show the work for the next few days.

What happens when the Product Backlog is not clear enough at Sprint Planning?


Options are :

  • Nothing; the Sprint would be planned anyway.
  • The Sprint would be cancelled, and the next one will start as soon as enough items at the top of the Product Backlog are clear.
  • The Sprint Planning would be delayed, until enough refinement is done on the items at the top of the Product Backlog.
  • The Sprint Planning would be extended, to have the items refined before adding them to the Sprint Backlog.

Answer :Nothing; the Sprint would be planned anyway.

Practice Tests for Scrum Master Certification Assessments Set 16


Options are :

Answer :FALSE

Which of the following are time-boxed events in Scrum?


Options are :

  • Sprint Planning
  • Daily Scrum
  • Sprint Review
  • Sprint Retrospective
  • All of the above

Answer :All of the above

Practice Tests for Scrum Master Certification Assessments Set 13


Options are :

  • Product Backlog items are either 'done' or 'not done.' This the helps with transparency, reduces complexity and allows for improved empiricism.
  • Continue Sprinting until the work is complete and redefine a new Sprint time-box based on the results of the current Sprint.
  • The Sprint length holds and the Development Team continuously learns what is actually possible to do within the time-box.

Answer :The Sprint length holds and the Development Team continuously learns what is actually possible to do within the time-box.

Which statement is correct about the length of the Sprints?


Options are :

  • All Sprints must be 1 month or less and it is optimal to have a consistent Sprint length.
  • The Sprint length is dependent on the development effort forecasted (amount of items selected) during Sprint Planning.
  • The Sprint length is calculated by aggregating the time required to design, code and test.
  • The Sprint Length is defined by the Scrum Master.

Answer :All Sprints must be 1 month or less and it is optimal to have a consistent Sprint length.

Who can prematurely cancel a Sprint?


Options are :

  • The Development Team
  • The Product Owner
  • The Stakeholders
  • The Scrum Master

Answer :The Product Owner

Scrum Master Certification Prep - Questions Set 10


Options are :

  • Help the Product Owner understand the value of including business functionality into every Sprint, regardless of how small and explain to him/her that the best architecture and infrastructure emerge alongside the development of the functionality.
  • Support the Product Owner's decision as he/she is accountable for maximizing the value of the work that the Development Team does.
  • Explain that one Sprint may be too short to finish the architecture and he should pre-allocate subsequent Sprints just in case.
  • Add at least one technical architect to the Development Team to ensure the architecture can be completed in the first Sprint.

Answer :Help the Product Owner understand the value of including business functionality into every Sprint, regardless of how small and explain to him/her that the best architecture and infrastructure emerge alongside the development of the functionality.

In what ways do time-boxes help promote the Scrum principle of self-organization?


Options are :

  • Time-boxes help everyone focus on the same problem at the same time and encourage the people who are closest to the problem to create the best possible result in the time allotted, give the current context.
  • Time-boxes protect the team from interruptions so that they can spend more time coding. It reduces the number of meetings and time spent in meetings.
  • Time-boxes help the team commit to completing the scope of work within the time limit. It helps stakeholders define when the work needs to be released.

Answer :Time-boxes help everyone focus on the same problem at the same time and encourage the people who are closest to the problem to create the best possible result in the time allotted, give the current context.

The Scrum Team has just closed their first Sprint. When should their second Sprint begin?


Options are :

  • When the Scrum Team declares they are ready.
  • After Sprint Planning for the second Sprint.
  • After User Acceptance Testing is completed on the previous Increment.
  • Immediately.

Answer :Immediately.

Quick Practice Tests for Scrum Master Certifications Set 5


Options are :

  • The Product Owner should come to the Sprint Planning with a clearly defined Sprint Goal.
  • The Product Owner orders the Product Backlog according to business objectives. During the Sprint Planning, the Development Team will select items from the Product Backlog and work with the Product Owner to craft the Sprint Goal based on the forecasted items.
  • The Development Team is responsible for crafting the Sprint Goal based on the principle of self-organization. The Product Owner must respect the Development Team's decision.
  • The Product Owner is responsible for crafting the Sprint Goal as he/she is accountable for maximizing the value of the work the Development Team does.
  • The stakeholders are responsible for crafting the Sprint Goal in collaboration with the Product Owner.

Answer :The Product Owner orders the Product Backlog according to business objectives. During the Sprint Planning, the Development Team will select items from the Product Backlog and work with the Product Owner to craft the Sprint Goal based on the forecasted items.

What output from Sprint Planning provides guidance and overarching direction on why the Development Team is building the Increment?


Options are :

  • The Sprint Burndown chart
  • The Sprint Goal
  • The Sprint Backlog
  • The task list

Answer :The Sprint Goal

During Sprint Planning, the Development Team must select enough Product Backlog items to satisfy the stakeholders.


Options are :

Answer :FALSE